EasyManua.ls Logo

Daikin FCQ50B7V1 - Removal of Horizontal Vane

Daikin FCQ50B7V1
390 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE05-04 Disassembly and Maintenance
Part 5 – Disassembly and Maintenance 5–49
3
5
1
5
1.12.4 Removal of Horizontal Vane
Warning Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step Procedure Points
1 Removing the decoration
panel
Q Refer to the "Removal
of Decoration Panel"
2 Remove the padding at
four corners of frame
fixed with three screws
each. At that time, peel
the end of black sealing
material of discharge port
in part.
Q Peel not the anti-sweat
material but only sealing
material of discharge port.
Note: When restore the
sealing material of
discharge port, be careful
that no clearance exists
between padding and
sealing material as
original installation.
(Otherwise, due dripping
may occur due to leakage
of cool air.)
(S2642)
(S2643)
Anti-sweat material
Sealing material
of discharge port
(S2644)
Padding
Sealing material
of discharge port
Anti-sweat material

Table of Contents

Other manuals for Daikin FCQ50B7V1

Related product manuals