SiENBE05-722_A
Trial Operation and Field Settings 207
Part 8
Trial Operation and
Field Settings
1. Trial Operation ....................................................................................208
2. Field Settings ......................................................................................209
2.1 When 2 Units are Installed in 1 Room..................................................209
2.2 Standby Electricity Saving....................................................................210
2.3 Facility Setting Jumper (cooling at low outdoor temperature) ..............211
2.4 Jumper and Switch Settings.................................................................212
3. Application of Silicon Grease to a Power Transistor and
a Diode Bridge ....................................................................................213