EasyManua.ls Logo

Daikin FTXS20G2V1B - Initial Setup and Preparation; Battery Installation and Holder Mounting

Daikin FTXS20G2V1B
15 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English 6
Indoor Unit Installation
1.
Installing the mounting plate.
The mounting plate should be installed on a wall which can support the weight of the indoor unit.
1) Temporarily secure the mounting plate to the wall, make sure that the panel is completely level, and mark the boring
points on the wall.
2) Secure the mounting plate to the wall with screws.
Recommended mounting-plate retention spots and Dimensions
Liquid pipe end
Drain hose position
Through the wall
hole φ65mm
* The removed pipe port cover can be
kept in the mounting plate pocket.
Gas pipe end
Bilt size: M10
Place a leveler on raised tab.
Recommended mounting
plate retention spots.
(5 spots in all)
Bilt size: M10
φ65
φ65
44.5
45.5
295
Use tape measure
as shown.
Position the end
of a tape measure
at .
115
56.5
147.5
450
103
400
200
44.5
60.5
45.5
175.5
Keep here the piece cut out
from the unit for piping.
60.5
61
149
278.5 50
800
36
Removed pipe
port cover
A
Mounting plate
01_EN_3P207052-1.fm Page 6 Wednesday, September 19, 2007 4:46 PM

Other manuals for Daikin FTXS20G2V1B

Related product manuals