EasyManua.ls Logo

Daikin FTYN25CVMB9 - Removal of PCB and Electrical Box

Daikin FTYN25CVMB9
246 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Unit / RK(X)H-C, ARK(X)H-C, R(Y)N-C SiENBE04-401A
194 Removal Procedure
3.3 Removal of PCB and Electrical Box
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step Procedure Points
1. Remove the drip proof
plate.
The drip proof plate has 5
hooks.
Be sure to restore the drip
proof plate and to avoid
losing or damaging it.
1
Undo the 5 hooks and
remove the drip proof
plate.
2. Remove the PCB.
1
2
Disconnect the earth
terminal.
Remove the insulation
sheet.
Drip proof plate
(R4027)
(R4028)
Insulation sheet
(R4029)

Table of Contents

Related product manuals