Daikin Navigator WWV - Pre-Start Checklist; Pre-Start Electrical Checks; Pre-Start Miscellaneous Checks

Daikin Navigator WWV
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
61
IOM 1264-4
WWW.DAIKINAPPLIED.COM
APPENDIx
Pre-Start Checklist
©2024 Daikin Applied Form SF-18003 PN 331977001 Rev 0A 30 Jan 2024
Pre-Start ChecklistScrew Chillers
Must be completed, signed and provided to Daikin Applied at least 2 weeks prior to requested start date.
Job Name
Installation Location
Customer Order Number
Model Number(s)
G.O. Number(s)
Chilled Water and Condenser Water for Water-cooled Chiller
Yes
No
N/A
Initials
Piping complete
Water strainer(s) installed in piping per manual requirements
Water Systemflushed, filled, and vented; Water treatment in place
Cooling tower flushed, filled, vented; Water treatment in place (if applicable)
Pumps installed and operational (rotation checked, strainers installed and cleaned)
Controls operational (3-way valves, face/bypass dampers, bypass valves, etc.)
Water system operated and tested; flow meets unit design requirements
Flow switch(es) - installed, wired, and calibrated
Vent installed on evaporator
Glycol at design % (if applicable)
Electrical
Yes
No
N/A
Initials
Building controls operational
*Power leads connected to power block or optional disconnect
Power leads have been checked for proper phasing and voltage
All interlock wiring complete and compliant with Daikin Applied specifications
Power applied at least 24 hours before startup
Oil heaters energized at least 24 hours before startup (not applicable for WWV models)
Chiller components (EXV Sensors Transducers) installed and wired properly
*Wiring complies with National Electrical Code and local codes (see notes)
Remote EXV wired with shielded cable (if applicable)
Miscellaneous
Yes
No
N/A
Initials
Unit control switches all off
Remote Evaporator Piping factory reviewed and approved (if applicable)
All refrigerant components/piping leak tested, evacuated and charged
Thermometers, wells, gauges, control, etc., installed
Minimum system load of 80% capacity available for testing/adjusting controls
SiteLine
TM
cloud-connected controls included and needs to be commissioned
Document Attached: Technical Data Sheet from Selection Software
Document Attached: Final Order Acknowledgement
Document Attached: Remote evaporator piping approval (if applicable)
Notes: The most common problems delaying start-up and affecting unit reliability are:
1. Field installed compressor motor power supply leads too small. Questions: Contact the local Daikin Applied sales representative*. State size,
number and type of conductors and conduits installed:
a. From Power supply to chiller
2. Refer to NEC Article 430-22 (a)
2. Remote Evaporator piping incomplete or incorrect. Provide approved piping diagrams.
3. Items on this list incorrectly acknowledged may result in delayed start and extra expenses incurred for return trips.
Contractor Representative
Daikin Applied Sales Representative
Signed:
Signed:
Name:
Name:
Company:
Company:
Date:
Date:
Phone/Email:
Phone/Email: