Do you have a question about the Daikin RPS and is the answer not in the manual?
Explains DANGER, WARNING, and CAUTION symbols used for safety.
Details symbols, descriptions, reset, location, settings, and part numbers for controls.
Step-by-step guide for assembling the RCS roof curb.
Illustrates the assembly of RPS/RFS roof curbs.
Safety precautions and procedures for rigging and handling the unit.
Guidance on determining whether a 4 or 6-point lift is required.
Steps for reconnecting power and control wiring after splitting units.
Guidelines for refrigerant piping installation, sizing, and oil return.
Procedure for checking and leak testing the system's holding charge.
Steps for evacuating the system to remove moisture and non-condensables.
Step-by-step guide for charging the unit with refrigerant.
Steps for charging the system with refrigerant in the field.
Guidelines for installing ductwork, including access and flexible connections.
Procedure for installing duct static pressure sensor taps for VAV systems.
Guidelines and diagrams for field power wiring installations.
Instructions for making field control wiring connections.
Describes the unit's behavior upon initial power connection.
Details the sequence of operation for supply and return fans.
Explanation of the economizer's function and operation.
Recommended preventive maintenance tasks for system inspection.
Information on proper refrigerant charge for micro-channel condensers.
Checklist for initial inspection items before unit startup.
Checklist for verifying compressor operation during startup.
Section for recording detailed performance data during startup.
Checklist for gas burner checks, tests, and startup procedures.
Explains DANGER, WARNING, and CAUTION symbols used for safety.
Details symbols, descriptions, reset, location, settings, and part numbers for controls.
Step-by-step guide for assembling the RCS roof curb.
Illustrates the assembly of RPS/RFS roof curbs.
Safety precautions and procedures for rigging and handling the unit.
Guidance on determining whether a 4 or 6-point lift is required.
Steps for reconnecting power and control wiring after splitting units.
Guidelines for refrigerant piping installation, sizing, and oil return.
Procedure for checking and leak testing the system's holding charge.
Steps for evacuating the system to remove moisture and non-condensables.
Step-by-step guide for charging the unit with refrigerant.
Steps for charging the system with refrigerant in the field.
Guidelines for installing ductwork, including access and flexible connections.
Procedure for installing duct static pressure sensor taps for VAV systems.
Guidelines and diagrams for field power wiring installations.
Instructions for making field control wiring connections.
Describes the unit's behavior upon initial power connection.
Details the sequence of operation for supply and return fans.
Explanation of the economizer's function and operation.
Recommended preventive maintenance tasks for system inspection.
Information on proper refrigerant charge for micro-channel condensers.
Checklist for initial inspection items before unit startup.
Checklist for verifying compressor operation during startup.
Section for recording detailed performance data during startup.
Checklist for gas burner checks, tests, and startup procedures.
| Brand | Daikin |
|---|---|
| Model | RPS |
| Category | Air Conditioner |
| Language | English |