EasyManua.ls Logo

Daikin Sensira Series - Page 77

Daikin Sensira Series
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 | Components
Service manual
77
FTXF20~71A + FTXF20~25B + FTXF20~42C + ATXF20~71A + ATXF20~42C
+ RXF20~71A + RXF20~60B + RXF20~42C + ARXF20~71A + ARXF20~42C
Split Sensira R32
ESIE18-12E – 2021.02
a
a Fuse
Blown fuse on the main PCB? Action
Yes Replace the blown fuse, see "Repair
procedures"[481].
No Return to "Checking procedures"[474]
of the main PCB and continue with the
next procedure.
To check the rectifier voltage of the main PCB
Prerequisite: First perform all earlier main PCB checks, see "Checking
procedures"[474].
1 Turn ON the power of the unit.
2 Measure the voltage on the rectifier voltage check terminals (+ and –) on the
main PCB.
Result: The measured voltage MUST be approximately 324VDC.
ba
a + terminal
b – terminal
INFORMATION
When measuring on the front of the main PCB, make sure to locally remove the
protective varnish with the test leads of the multi meter.

Table of Contents

Related product manuals