17.3 Mounting the outdoor unit
17.3.1 About mounting the outdoor unit
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1 Providing the installation structure.
2 Installing the outdoor unit.
3 Providing drainage.
4 Preventing the unit from falling over.
17.3.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
General safety precautions
Preparation
17.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 4 sets of anchor bolts, nuts and washers (field supply) as follows:
(mm)
758
>150
(480-490)
485
M12
a
a Make sure not to cover the drain holes of the bottom plate of the unit.
INFORMATION
The recommended height of the upper protruding part of the bolts is 20mm.