EasyManua.ls Logo

Daikin VRV IV RYYQ10T7Y1B Series - 9.2 Piping diagram: Outdoor unit

Daikin VRV IV RYYQ10T7Y1B Series
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Technical data
Installation and operation manual
35
RYYQ+RYMQ+RXYQ8~20T7Y1B
VRV IV system air conditioner
4P370473-1C – 2016.07
The installation space required on these drawings are for full load
heating operation without considering possible ice accumulation. If
the location of the installation is in a cold climate, then all
dimensions above should be >500 mm to avoid accumulation of
ice in between the outdoor units.
INFORMATION
The service space dimensions in above figure are based
on cooling operation at 35°C ambient temperature
(standard conditions).
INFORMATION
Further specifications can be found in the technical
engineering data.
9.2 Piping diagram: Outdoor unit
INFORMATION
For a legend explaining the figures below, refer to the end
of this topic.
Piping diagram: RYYQ8~12
sv
sv
M
HPS
INV
M1C
R3T
(S1NPL) (S1NPH)
(S1PH)
R6T
R5T
R7T
R1T
M1F
R4T
R8T
10-12HP
R21T
j
g
i
o
p
k
m
a
f
l
t
s
r
v
h
w
d
e
c
Piping diagram: RYYQ14~20
R3T
R6T
R5T
R7T
R1T
R4T
R21T
a
b
nm
k k
e
d d
e
f
l
j
g
i
o
p
t
s
r
v
h
w
c
sv
INV
INV
HPS
sv
sv
HPS
M2F
M
M1F
M
M2C
M1C
(S1NPH)(S1NPL)
(S1PH) (S2PH)
R22T
R8T
10-12HP
Piping diagram: RYMQ8~12
R8T
10-12HP
R3T
R6T
R5T
R7T
R1T
R4T
R21T
a
m
k
e
d
f
l
g
w
o
p
t
u
s
r
j
h
c
sv
sv
M
INV
M1C
M1F
(S1NPH)(S1NPL)
(S1PH)
HPS
Piping diagram: RYMQ14~20
R3T
R6TR5T
R7T
R1T
R4T
R21T R22T
a
b
nm
k k
f
l
j
g
o
p
h
w
e
d d
e
c
sv
M
sv
INV INV
sv
M2F
M
M1F
M2C
M1C
(Y1E)
(S1NPH)
(S1PH)
(S2PH)
(S1NPL)
t
u
s
HPS
R8T
10-12HP
HPS
r
Piping diagram: RXYQ8~12
R3T
R6T
R5T
R7T
R1T
R4T
R21T
j
h
g
w
e
c
o
f
l
m
k
a
d
t
s
r
INV
M
sv
sv
M1C
M1F
(S1NPL)
(S1NPH)
(S1PH)
HPS
R8T
10-12HP

Table of Contents

Related product manuals