EasyManua.ls Logo

Dalla Corte SUPER MINI - Machine Startup and Operation; Espresso Coffee Preparation Steps

Dalla Corte SUPER MINI
9 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
USER’S MANUAL LII REV. 03
Install the drain flexible pipe on the connection holding the rubber of the drain basin placed under the
basin and put the other end of the pipe directly into the drain siphon .
Check that the drain pipe has the correct sloping to allow the basin to discharge quickly.
Follow these instructions with the help of the scheme of the machine placed at the end of this manual
Turn on the general switch (1a) of the machine on position 1 and check that the line indicator lights
up.
Immediately after switching on the machine, the automatic auto-level starts filling the boiler and the
indicators (2) of the keyboard (3) start flashing . When the boiler has been charged , the coffee-
group starts heating (4) for about 7 minutes .
When the indicators (2) stop flashing, the group (4) has reached the correct thermal level and can
be used to make coffee.
When the group has the correct thermal level , you can turn on the switch (1b) to heat the boiler.
When the manometre controlling the boiler pressure reaches 1,5 bar , it is possibile to use the
drawing tap for steam (5)and hot water (6).
In order to always obtain a good coffee , the filter-holder (9) must be continuously connected to the
coffee group (4 ) so that it is always at the correct temperature.
Take away the filter-holder (9), avoiding to touch the hot metallic parts.
Afterwards clean the filter within the filter-holder from the possibile remains of used coffee.
Then charge the filter with new ground coffee (1 coffee dose for the one shot filter, 2 doses for the two-
shots filter), press the ground coffee with the appropriated manual coffee-tamper with which the machine
is equipped and clean the filter edge from possible coffee remains.
Firmly connect the filter-holder to the coffee-group (4).
Place the cups on the shelf 12 (whose height can be regulated according to the dimensions of the cups)
and press one of the two automatic dosing buttons P1-P2.
When the indicator of the pressed key goes off, coffee is ready.
NOTE
This machine has three buttons to make coffee , 2 ( P1 and P2) of which electronically dosed and one
with continuous supply function and stop (P3).
The two dosed buttons must be regulated by the technician at the moment of the installation in
accordance with the user , who must not try to change the programming on his own initiative.
HOT MILK PREPARATION
PREPARATION OF ESPRESSO COFFEE
PREPARAZIONE DEL LATTE CALDO
ATTENTION
Do not put the hands under the coffee groups when they are functioning.
Do not touch metallic parts of the coffe groups and of the filter-holders because they may cause bad
burns .
ATTENTION
If you do not follow the previous instructions, the safety and the lasting of the machine may be
endangered and the warranty itself decays.

Related product manuals