InstallationGuideTermixVVX-I
6.3.2Strainer
Strainersshouldbecleanedregularlybyauthorizedpersonnel.The
frequencyofcleaningwoulddependonoperatingconditionsand
themanufacturer’sinstructions.
6.3.3GTUPressureEqualizer
TheGTUPressureEqualizerabsorbstheexpansiononthe
secondarysideoftheTermixwaterheatersandcanbeusedasa
substitutetothesafetyvalve.
Furthermorethepressureequalizerabsorbsapossibleincreasein
pressure,soadischargeoutletisomitted.
TheGTUPressureEqualizermaynotbeappliedinsystemswithhot
watercirculation.
6.3.4Fittingpiece
Thesubstationisequippedwithattingpieceforenergymeter.
Assemblyofenergymeters:
1:Closeballvalves
ClosetheballvalvesonDHSupplyandDHReturn,ifthereiswater
onthesystem.
2:Loosennuts
Loosenthenutsonthettingpiece.
3:Removettingpiece
Removethettingpieceandreplaceitwiththeenergymeter.Do
notforgetthegaskets.
4:Tightenconnections
Aftermountingoftheenergymeterremembertocheckand
tightenallthreadedconnections.
Sensorpocket,energymeter
Thesensorsoftheenergymeterismountedinthesensorpockets.
DanfossDistrictEnergy
VI.EH.G3.02/LUK40440
DEN-GT
15