InstallationGuideTermixVVX-I
4.2Start-up
Start-up,Indirectheating
Filling:
1:Firstll
Whencarryingoutrstll,theheatexchangermustbeslowlylled
withwateruntilitreachesworkingpressure.
2:Pressuregauge
TheHEpressuregaugeindicatesthepressureoftheHEsystem.This
instructionmustbefollowedstrictly,toavoiddangeroussituations.
3:Supplyhose
AballvalvewithplugisinstalledintheHEreturnline.Tollthe
system,theballvalvemustrstbeclosed,theplugremovedand
asupplyhoseconnected.Onre-openingtheballvalve,system
llcancommence.
4:Pre-pressure
Whenllingthesystemwithwater,thepressuregaugeshouldbe
observedclosely.Theexpansionvesselissuppliedpre-pressurised
to0.5bar.Thepre-pressurerequiredateachsubstationwill
dependonsystemhead(thedistancebetweenthelowestand
highestpointinthesystem),forexample:
5:Fillingstop
Fillingmuststopwhenthepressuregaugeshowsapressure
approximately1-2barhigherthanthepre-pressuresetting.The
ballvalveisthenclosed,thehoseremovedandtheplugputback
in.
Start-up:
1:Pumpspeed
Setthepumptohighestspeedbeforestart-up.
2:Startpump
Startthepumpandheatthroughthesystem.
3:Openshut-offvalves
Theshut-offvalvesshouldthenbeopenedandtheunitobserved
asitentersservice.Visualcheckingshouldconrmtemperatures,
pressures,acceptablethermalexpansionandabsenceofleakage.
Iftheheatexchangeroperatesinaccordancewithdesign,itcanbe
puttoregularuse.
4:Ventsystem
Switchoffthepumpandventtheinstallationaftertheradiators
havebeenwarmedup.
5:Adjustpumpspeed
Setthepumptothelowestspeedconsistentwithcomfortand
electricityconsumption.
Normallythechange-overswitchissetinthemidposition(default).
Howeverforsystemswithunderoorheatingorsinglepipeloop
systems,itmaybenecessarytoturnthechange-overswitch
upwards.
Higherpumpspeedsareonlyusediftheheatingrequirement
increases.
Re-thightenconnections
Afterwaterhasbeenaddedtothesystemandthesystemhasbeen
putintooperation,re-tightenALLconnections.
Pump
Thepumpmustbeswitchedoffduringsystemll.
Height(m)Pressure(bar)