Termix VVX-IV - 7 Series DS Fully insulated
Pre hand over check list
Description: Pos. Page OK Remark:
Connection connected correctly 10
All connections tightened
Primary system fl ushed, through fl ushing bypass 11
2 Strainers checked 9 20
Diff erential pressure controller adjusted 31 22
Clip on actuator removed 69 22
Wiring completed 15-16
Mains connected
Room controller connected and working
Pre payment unit connected and working
Pump setting completed 10 22-23
Correct pressure on secondary system 26 18
System properly vented 48 20
UFH stat mounted correctly on heating supply line 60 24
Safety valve checked and piped to drain 4 24
DHW Temperature setting 74 25
Heating temperature setting 7 21
Flushing bypass closed
Insulation has been remounted
Date: Unit No.: Carried out by: