EasyManua.ls Logo

Data Aire gPod - Page 94

Default Icon
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Inspection Checklist
Monthly Maintenance Inspection Checklist
Model No.
Serial No.
Prepared by:
See signature line below
Air Filters
Condensate Drain and Pump (if applicable)
Check for restricted air flow
Check for water leaks
Check for restricted air flow
Blower Section (if applicable)
Pump operation
Blower wheel free of debris moves freely
Check belt tension and condition
Steam Generating Humidifier (if applicable)
Bearings in good condition
Check canister for deposits and water level
Check pulleys and motor mounts
Check condition of steam hose and clamps
Air Distribution Section
Electrical Panel
Check for restriction in grille(s)
Check contractor operation
dap4 or Mini-dap4 controller operations
Compressor
Check for leaks
Equipment Runtimes
Condenser ___________ hours
Refrigeration Cycle/Section
Compressor ___________ hours
Check crank case temperature
Reheat No. 1 ___________ hours
Reheat No. 2 ___________ hours
Air Cooled Condenser (if applicable)
Reheat No. 3 ___________ hours
Condenser coil clean
Humidifier ___________ hours
Motor mounts tight
Dehumidification ___________ hours
Motor fan bearings in good condition
Energy Saver ___________ hours
Refrigeration lines properly supported
Reset all to read zero runtimes
Water/Glycol Fluid Cooler (if applicable)
Water regulating valve function
Temperature/Humidity set at: ___° ___% RH
Check for water/glycol leaks (piping area)
Glycol Pump(s) (if applicable)
Glycol leaks (pump area)
Pump operation
Auto air vent clean of mineral deposits
X

Table of Contents

Related product manuals