EasyManua.ls Logo

DataRemote CDS-9010 - Pre-Installation Task Checklist; On-Site Arrival and Initial Testing

DataRemote CDS-9010
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TOOLS LIST FOR TECH (continued)
Flashlight
Cat5 patch cables of varying lengths
All termination tools and line/tone testers
NOTE: Photo of Cable Tester results will be required in deliverables
All hand tools required to make Cat5 cable runs (glow-stick, wire tape, etc.)
Butt Set (or analog test telephone if “butt set” doesn't have an RJ-11 plug/jack interface)
Label maker (to label biscuit jacks)
Digital camera with 3.0 mega pixels or higher photo resolution
6" torpedo level
Voltmeter
Please review this steps before starting and ensure you bring a printed copy of this guide and
Installation Checklist to the site, to use it as a reference during the installation.
PREP-INSTALLATION TASKS.
On-site arrival and initial equipment testing:
1. Upon arrival, call your respective Program Manager on the check-in line to confirm that you are
on-site and be prepared to supply the Store #Number/ Location ID & City/ST listed on your Work
Order
2. Ask for the Manager On Duty (MOD), and introduce yourself with the purpose of your visit as the
installer for the DataRemote CDS-9010 device.
a. Please report any store access issue to your Project Manager immediately.
3. If the DataRemote CDS-9010 device was shipped to the site in advance of your dispatch; please
obtain this package from the Manager.
a. IMPORTANT: Please open the package in front of MOD and inspect for a
complete kit per the previous page's Material's List; especially if package was
already opened when it was given to you
b. Report any missing equipment immediately to Project Manager.
4. IMPORTANT: Any directives from on-site store personnel deviating from the norm or
outside the scope of this guide must be relayed to the PM immediately. If you encounter a
problem in the field which requires escalation, please contact the Project Manager
immediately (bottom line, contact Project Manager for approval prior to accepting and acting
upon any direction from store personnel on-site).
IMPORTANT! TECHNICIAN MUST FOLLOW THIS MANUAL EXACTLY, AS EACH PHASE & STEP
IS DESIGNED TO ENSURE PROPER MIGRATION. ANY DEVIATION MUST ABSOLUTELY BE APPROVED
BY YOUR RESPECTIVE EMPLOYER ONLY!!
Page 14
Revision No. 004 April 2020

Other manuals for DataRemote CDS-9010

Related product manuals