Checklist
6
Setup instructions neo
1.21
DATRON AG
6-1
6 Checklist
The following checklist provides an overview and summary of all necessary preparatory work for
setting up a DATRON machine. The items point out the individual steps. For exact details, please refer
to the respective chapter. Using this checklist, please check whether everything is ready for bringing
the machines in to you.
If you should have any further questions regarding this checklist, we will be happy to answer them.
yes No Checklist for machine setup
Are the access routes to the setup site free of obstacles? Is there a freight elevator, and
is this suitable for the weight of the machine (see Chapter 1, "Setting up the machine")?
Is there enough room for setup and the surrounding area and is the setup site suitable
for the weight of the machine (see Chapter 1, "Setting up the machine" and Chapter 3,
"Technical data")?
Can the required room climate be complied with, and is there sufficient ventilation (see
Chapter 1, "Setting up the machine")?
Is the required voltage supply available (see Chapter 2.1, "Voltage supply")?
Is there a suitable Internet connection available for remote maintenance (see
Chapter 2.2, "Internet connection")?
Is a suitable network available (see Chapter 2.3, "Network integration")?
Is the compressed air connection with the corresponding air treatment available (see
Chapter 2.5, "Compressed air supply")?
Is a cooling lubricant appropriate for the application required (see Chapter 2.6, "Cooling
lubricant")?
If a compact deduster is to be used, is there a designated power connection for this (see
Chapter , "Compact deduster (optional)")?
Is there a suitable central suction system? If so: What kind of suction nozzle is required?
Suction nozzle: _________________________________
If your country has import restrictions on hazardous liquids, such as oil, cooling lubri-
cants and coolant, the method of supply must be clarified on site.