EasyManua.ls Logo

Dell EMC SC5020 - Page 32

Dell EMC SC5020
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 20. Install the Mezzanine Card
1
Mezzanine card 2 Screw
3 Touchpoint (blue dot) 4 Connector
5 Release latch
2 Press down simultaneously on the release latch and the blue dot on the rear of the mezzanine card until the card is secure in the
connector.
3 Insert and tighten the screw that secures the mezzanine card to the storage controller.
4 Replace riser 1 in the storage controller.
5 Replace the cover on the storage controller.
6 Remove the service bae from the chassis.
CAUTION
: To prevent a thermal shutdown of the storage system, the storage controller must be installed within three
minutes of removing the service bae.
7 Install the storage controller in the chassis.
8 Reconnect the cables to the storage controller.
9 Clear the storage controller swap status from the Hardware tab in Dell Storage Manager.
For instructions, see the Dell Storage Manager Administrator’s Guide.
Next steps
1 Use Dell Storage Manager to edit the Storage Center settings and set the operation mode of the Storage Center to Production mode.
2 If you added a mezzanine card to an empty mezzanine card slot, use Dell Storage Manager to congure the new fault domains.
3 Use Dell Storage Manager to send SupportAssist information to technical support.
32
Replacing Storage System Components

Related product manuals