Installing the Hardware 3
1
Installing the Hardware
This guide assumes all site preparation has been performed before installing the
chassis.
Installing the S2410 Chassis in a Rack or
Cabinet
There are two models of the S2410 switch. Each model includes:
S2410P
24 fixed 10GbE XFP ports (needs XFP optics)
1 RJ-45 console port with RS-232 signaling
1 RJ-45 dedicated Ethernet Management port (labeled 10/100 Ethernet)
S2410CP
20 fixed 10GbE BaseCX4 ports
4 ports for optional 10G XFP transceivers (needs XFP optics)
1 RJ-45 console port with RS-232 signaling
1 RJ-45 10/100 dedicated Ethernet Management port (labeled 10/100
Ethernet).
To install the S2410 system, Dell Force10 recommends that you complete the
installation procedures in the order presented below.
Always handle the system with care. Avoid dropping the S2410 chassis.
CAUTION: Always wear an ESD-preventive wrist or heel ground strap when
handling the S2410. As with all electrical devices of this type, take all
necessary safety precautions to prevent injury when installing this system.
Electrostatic discharge (ESD) damage can occur if components are
mishandled.

Other manuals for Dell Force10 S2410-01-10GE-24P

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell Force10 S2410-01-10GE-24P and is the answer not in the manual?

Dell Force10 S2410-01-10GE-24P Specifications

General IconGeneral
ManageableYes
Jumbo Frame SupportYes
Product TypeSwitch
Uplink Ports4 x 10 Gigabit SFP+
MAC Address Table Size32K entries
Operating Temperature0 °C to 40 °C
Storage Temperature-40 °C to 70 °C
Power SupplyInternal