EasyManua.ls Logo

Dell Force10 S25-01-GE-24P - Four-Post Rack-Mounting with Threaded Rails

Dell Force10 S25-01-GE-24P
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20 Installing the S25P
Four-Post Rack-mounting with Threaded Rails
Ensure that there is adequate clearance surrounding the cabinet or rack to permit access and airflow. If you
are installing two S25P switches side-by-side, position the two S25P chassis at least 5 inches (12.7 cm)
apart to permit proper airflow. Follow the steps below to install a switch into a 4-post 19-inch equipment
rack, using the attached front mounting brackets and the optional adjustable rear-mounting brackets.
Step Task
1
Align the three screw holes of the adjustable rear mounting bracket with the three holes in the S25P chassis, and
secure the mounting bracket with three screws.
Figure 7 Four-Post Rack-mounting with Threaded Rails
2 Insert the S25P into the rack, and secure the chassis to the front post with two screws. Then secure the chassis to
the rear posts with two screws.
Figure 8 Four-Post Rack-mounting with Threaded Rails .
P
2
8
2
7
X
F
P
2
6
A
C
1
X
F
P
2
5
A
C
2
A
l
a
r
m
S
t
a
c
k
I
D
S
25
-
0
1
-G
E
-2
4
P
P
2
8
2
7
X
F
P
2
6
A
C
1
X
F
P
2
5
A
C
2
A
l
a
r
m
S
t
a
c
k
ID
S
2
5
-0
1-G
E
-24P

Other manuals for Dell Force10 S25-01-GE-24P

Related product manuals