EasyManua.ls Logo

Delta DPM-C530A - Basic Checks

Delta DPM-C530A
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
4.2 Basic Checks
Items Checked Contents of Checks
General Check
Regularly check for losing of the xing mount at the location where the power
meter and device are connected.
Guard against entrance of foreign objects, such as oil, water, or metal powder at
the heat dissipating holes. Guard against entrance of drill cut powders into the
power meter.
Should the power meter be installed at a place present with harmful gas or dust,
guard against entrance of those matters into the meter.
Pre-operation
Check
(not supplied with
control power)
Insulate the connecting spot of the wiring terminals.
Communications wiring should be done properly, or abnormal operations might
result.
Check for presence of conducive and flammable objects, such as screws or metal
pieces, in the power meter.
Should electronic devices used near the power meter experience electromagnetic
interference, tune with instruments to reduce electromagnetic interference.
Check for correct voltage level for the power supplied to the power meter.
Pre-running Check
(supplied with
control power)
Check whether power indicator light is lit.
Check whether communication between every device is normal.
If there is any abnormal response from the power meter, contact your distributor
or our customer service center.

Related product manuals