5.3.5. General Settings
Users can set Language, Date and Time, and RS-485 communication baud
rate in this page.
5.3.6. Install Settings
To enter Install Settings page, users have to enter correct password.
There are 3 sets of password with different permissions: user level, installer
level, and manufacturer level. The following sub-sections will introduce the
setting items in Install Settings page of user level and installer level.
Language
Date and Time
Baud Rate
Figure 5-9 General Settings page
Figure 5-10 Install settings page and password permissions
CAUTION
The settings in Install Settings page can only be adjusted by qualified installers
or engineers. Changing these settings may result in damage to the inverter
and other equipment.
Inverter ID: 002
Insulation
Country
Grid Settings
DC Injection
Dry Contact
RCMU
EPO
ON
Normal Open
AC Connection
Anti-islanding
Max Power
Return to Factory
3P4W
ON
10500W
User Level:
- Inverter ID
- Insulation
- Country
- Dry Contact
- EPO
- AC Connection
- Max. Power
Manufacturer Level:
- All Settings
Installer Level:
- Inverter ID
- Insulation
- Country
- Grid Settings
- Dry Contact
- EPO
- AC Connection
- Max. Power
30
Turn on/off PV inverter

Other manuals for Delta RPI M6A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Delta RPI M6A and is the answer not in the manual?

Delta RPI M6A Specifications

General IconGeneral
BrandDelta
ModelRPI M6A
CategoryInverter
LanguageEnglish

Related product manuals