Page 15 AB20020
ASSEMBLY INSTRUCTIONS
15. Bolt the Platform Mounting Brackets (#30) to the frame
using four 1/2” x 1-1/4” hex head bolts (#17) and nylon
locknuts (#23).
16. Bolt the Platform (#8) to the Mounting Brackets (#4) using
four 3/8” x 1-1/4” hex head bolts (#14), flatwashers (#2)
and nylon locknuts (#26).
17. Bolt the Step (#9) to the platform as shown using two
1/2” x 1-1/4” hex head bolts (#17) and nylon locknuts(#23).
18. Bolt the Safety Rail (#10) to the platform as shown using two
1/2” x 1-1/4” hex head bolts (#17) and nylon locknuts (#23). Mount
wash tank bracket (#41) to front handrail (#10) with three 1/4”
x 1” round U-bolts (#16), flat washers and nylon locknuts. Attach
the eye wash tank with four bolts (#40), eight washers (#1) and
lock nuts (#32).
* FOR REFERENCE NUMBER
LIST AND DESCRIPTION SEE
PAGE 21
,7(0
3$57 '(6&5,37,21
47<
:$6+(5)/$7
:$6+(5)/$7
)/$7:$6+(5
721*8()+&0+&3635$<(56
[8%ROW
[%2/7:+((/
$66<635$<(5+,7&+
3/$7)250)+&0+36356
67(3)25+&0
6$)(7<+$1'5$,/)+&0
&277(53,1
:$6+(5)/$7
%2/71&;*5+(;+($'
%2/71&;+(;+($'*5
78%(
8%2/751'1&;;
%2/71&;
%2/71&;*5+(;
%22002817
8%2/7[[
+&3+26(+2/'(5%5.7
%2/71&;+(;)8//7+5($'
1871&/2&.1<,16(57
52'/2&.3,1
635,1*&2035(66,21
1871&1</21/2&.
%5$&($1*/(
6,1*/($;/(*$/+&0635$<(5
0$,1)5$0()+&0*635$<(5
67(307$1*/()+&0(75
1871&/2&.1</21,16(57
1871&1</21/2&.
%5$&.(7'0%+$*5281'67$1'
3267/21*67$1'
3/$7(675$3$1&+25
-$&.6,'(:,1'
$66<-$&.6725$*(02817
78%(
675$3
(<(:$6+7$1.:,7+/,'
*$/(<(:$6+7$1.%5$&.(7
+8%$66(0%/<121%5$.,1*
3(5$
*$/7$1.
3/6
/,'6328700)*$/
7/
7,5(/;;3/<78%(/(66
PLATFORM, STEP & HANDRAIL INSTALLATION