CAIRplus Assembly
PR-2009-0096-GB • Subject to modifications • R8-10/2015 33
5.2.3 Additional measures for units for outdoor installation
• After assembly is completed, you must remove the protective foil from the roof
panels.
5.2.4 Preparing roof installation
• Remove all lifting lugs (1).
• Install sealing washers at all screws and tighten them (2).
Fig. 5-25: Preparing roof installation
ATTENTION
Risk of damage to the unit!
9 Insufficient or improper sealing by others on site can cause water leakage and
damage to the equipment and building materials!
• Carefully seal all unit components.
• When installing roof components ensure that no loads are applied on the roof
panels. Do not walk on the floor panels.
• If necessary use a proper pad for the entire roof surface.
• During assembly and assembly pauses, take care that no rainwater gets into the
units.