EasyManua.ls Logo

Digium TE420B - Page 45

Digium TE420B
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Digium, Inc. Page 45
Chapter 3: Configuration
Timing:
This determines how timing is handled by the card.
0 - Card provides its own timing
1 - Receives timing from remote end
2 - Receives secondary backup timing from remote end
3 - Receives tertiary backup timing from remote end
4 - Receives quaternary backup timing from remote end
Only one span can be defined to take timing, and it defines timing for
the rest of the card’s spans.
Line Build Out:
For most setups the line build out is 0.
0: 0 db (CSU) / 0-133 feet (DSX-1)
1: 133-266 feet (DSX-1)
2: 266-399 feet (DSX-1)
3: 399-533 feet (DSX-1)
4: 533-655 feet (DSX-1)
5: -7.5db (CSU)
6: -15db (CSU)
7: -22.5db (CSU)
Framing:
T1 utilizes framing set for D4 (SF) or ESF. E1 utilizes CAS or CCS.

Related product manuals