Page #28 background image
Section3-User Responsibility, Machine
Pre
p
aration and Ins
p
ection
Operation & Maintenance Manual
Dingli Machinery
3-2
3.2 Preparation, Inspection and Maintenance
3.2.1 General
This section provides the necessary information needed by those personnel that are responsible
to place the machine in operation readiness, and lists checks that are performed prior to use of the
machine. It is important that the information contained in this section be read and understood
before any attempt is made to operate the machine. Ensure that all the necessary inspections
have been completed successfully before placing the machine into service. These procedures will
aid in obtaining maximum service life and safe operation.
Before make an inspection, the operator and other auxiliaries must wear the personnel protective
equipment such as gloves, safety belt, safety cap and so on.
The following table covers the periodic machine inspections and maintenance recommended by
Dingli Machinery Co.,Ltd. Consult local regulations for further requirements for aerial work
platforms. The frequency of inspections and maintenance must be increased as necessary when
the machine is used in a harsh or hostile environment, if the machine is used with increased
frequency, or if the machine is used in a severe manner.
Table 3-1.Inspection and Maintenance Table
Type Frequency
Primary
Responsibility
Reference
Pre-Start
Inspection
Before using each day; or
whenever there’s an
Operator change.
User or
Operator
Operation and Maintenance
Manual
Pre-Delivery
Inspection
Before each sale, lease, or
rental delivery.
Owner, Dealer,
or User
Operation and Maintenance
Manual
Frequent
Inspection
In service for 3 months or
150 hours, whichever
comes first; or Out of
service for a period of more
than 3 months; or
Purchased used.
Owner, Dealer,
or User
Operation and Maintenance
Manual
Annual
Machine
Inspection
Annually, no later than 13
months from the date of
prior inspection.
Owner, Dealer,
or User
Operation and Maintenance
Manual
Preventative
Maintenance
At intervals as specified in
the Operation &
Maintenance Manual
Owner, Dealer,
or User
Operation and Maintenance
Manual
3.2.2 Preparation for Use
Before a new machine is put into operation it must be carefully inspected for any evidence of
damage resulting from shipment and inspected periodically thereafter, as outlined in Delivery and

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the DINGLI BA22ERT and is the answer not in the manual?

DINGLI BA22ERT Specifications

General IconGeneral
BrandDINGLI
ModelBA22ERT
CategoryBoom Lifts
LanguageEnglish

Related product manuals