9) Place Drive control lever to Forward and carefully drive machine up ascension ramp until right
front wheel is on top of block.
10) With boom over left side of machine, place Drive control lever to Reverse and drive machine
off of block and ramp.
11) Have an assistant check to see that right front wheel remains elevated in position off of
ground.
12) Carefully activate Swing control lever and return boom to stowed position (centered between
drive wheels). When boom reaches center, stowed position, lockout cylinders should release
and allow wheel to rest on ground, it may be necessary activate Drive to release cylinders.
If lockout cylinders do not function properly, have qualified personnel correct the malfunction prior
to any further operation.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the DINGLI BA22ERT and is the answer not in the manual?

DINGLI BA22ERT Specifications

General IconGeneral
BrandDINGLI
ModelBA22ERT
CategoryBoom Lifts
LanguageEnglish

Related product manuals