EasyManua.ls Logo

DINGLI JCPT2212DC - Lifting Procedures and Center of Gravity

DINGLI JCPT2212DC
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATORS MANUAL with Maintenance Information
Operating Instructions
34
How to Raise the Guardrails
Follow the fold down instructions but in reverse
order.
To Extend and Retract Platform
1 Pull out the extension platform fixed screw.
2 Unlock the extension part of the platform
with the hand levers on the railing.
3 Push the extension part forward to the
desired length
4 Lock the extension part again with the
hand levers
5 The retraction of the carrier part is carried
out in the reverse order
Do not stand on the platform extension
while trying to extend it.
1
2
5
6
3
4

Related product manuals