EasyManua.ls Logo

DINGLI JCPT2223RT - Page 32

DINGLI JCPT2223RT
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATORS MANUAL with Maintenance Information
Function Tests
27
74 Lower the platform to the end.
75 Push and hold the auto level button.
76 Press and hold the function enable switch.
Activate the proportional control handle in
the direction indicated by the yellow arrow.
The outriggers will extend and level the
machine. A beep will sound when the
machine is level.
77 Raise the platform.
Result: The platform should rise to full
height.
78 Lower the platform.
Test Auxiliary Lowering
79 Push and hold the function enable button
and raise the platform approximately 60
cm.
80 Press the engine start/ flameout button to
engine off.
81 Push and hold the function enable button.
Activate the control handle in the direction
indicated by the yellow arrow.
Result: The platform should lower.
Test Platform extendable / retractable
Functions
82 Push and hold the Power platform button.
Press and hold the function enable switch.
Activate the proportional control handle in
the direction indicated by the blue arrow
Result: The platform should extend.
83 Push and hold the Power platform button.
Press and hold the function enable switch.
Activate the proportional control handle in
the direction indicated by the yellow arrow.
Result: The platform should retract.

Related product manuals