EasyManua.ls Logo

DINGLI JCPT2223RT - Page 50

DINGLI JCPT2223RT
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATORS MANUAL with Maintenance Information
Maintenance
45
A-10
Perform 30 Day Service
The 30 day maintenance procedure is a one
time procedure to be performed after the first
30 days or 40 hours of usage. After this
interval, refer to the maintenance tables for
continued scheduled maintenance.
1 Perform the following maintenance
procedures:
·B-6 Inspect the Tires and Wheels
(including lug nut torque)
·B-15 Perform Engine Maintenance
A-11
Perform Engine Maintenance
Engine specifications require that this one-time
procedure be performed after 50 hours of
operation.
Required maintenance procedures and
additional engine information is available in the
engine operators manual.
A-12
Perform Drive Axle Maintenance
Axle specifications require that this procedure
be performed every 100 hours.
Required maintenance procedures and
additional Axle information is available in the
Axle operators manual.

Related product manuals