Operation Overview - 26 1330 Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite. See page 28.
2. Inspect jobsite. See page 29.
3. Classify jobsite. See page 30.
4. Select best chain type and tooth pattern for your application. See page 51.
5. Consider optional equipment, if necessary. See page 52.
6. Check supplies and prepare equipment. See page 32.
7. Load unit onto truck or trailer. See page 40.
Trenching
1. Unload unit from truck or trailer. See page 42.
2. Start unit. See page 34.
3. Drive to starting point of trench. See page 34.
4. Dig the trench. See page 47.
5. Shut down unit. See page 35.
Leaving Jobsite
1. Restore the jobsite. See page 54.
2. Rinse unit and stow tools. See page 54.
3. Load unit onto trailer. See page 40.
NOTICE: If trencher becomes disabled and must be moved without engine running, see
page 43 for important instructions.