Operation Overview - 40 420sx Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite. See page 44.
2. Inspect jobsite. See page 45.
3. Classify jobsite. See page 46.
4. Select plow blade for your installation. See page 87
5. Select chain and teeth to match your soil type, if necessary. See page 89.
6. Check supplies and prepare equipment. See page 48.
7. Haul equipment to jobsite. See page 57.
Plowing
1. Start unit. See page 50.
2. Position tractor and controls. See page 65.
3. Attach product. See page 65.
4. Begin plowing. See page 66.
5. Complete the installation. See page 91.
6. Shut down tractor. See page 52.
Trenching
1. Start unit. See page 50.
2. Position tractor and controls. See page 72.
3. Begin trenching. See page 73.
4. Complete the installation. See page 91.
5. Shut down tractor. See page 52.