EasyManua.ls Logo

DITTING 807 - Operation; Setting the Grinding Degree

DITTING 807
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Opera on
NOTE!
Risk of overhea ng!
Exceeding the maximum permissible opera ng cycle can cause the grinder to
overheat.
Do not exceed the maximum opera ng cycle
(see “Technical data” sec on).
Observe the recommended break when the maximum permissible oper-
a ng cycle is reached (see “Technical data” sec on).
The grinder has a thermal overcurrent circuit-breaker which
interrupts the electric circuit of the grinder in the event of an
electrical overload.
To put the grinder back into opera on, rst set the On/O
switch (13) to switch posi on 0 (o ) and disconnect the power
plug (15).
Then push the release bu on (14) in.
You can now plug the power plug back into the socket and put
the grinder into opera on (see “Se ng up and connec ng the
grinder” sec on).
The grinder also has a motor protector, which switches o
the grinder when the motor becomes too hot. As soon as
the motor has cooled down, the grinder can be put back into
opera on (see “Troubleshoo ngsec on).
Se ng the grinding degree
The grind adjustment’s grinding degree scale (2) displays the
desired grinding degree.
The nest se ng is “1”.
1. Make sure that you have inserted the power plug (15) into a properly
installed safety socket.
2. Turn the grind adjustment (2) towards “1” for ne co ee grinding and in
the opposite direc on for coarse co ee grinding (see Fig. B).
COMMERCIAL COFFEE GRINDER
16

Related product manuals