16
2.3 Flight Procedures
2.3.1 Start
The PIC will run through the start up process as per the UAS checklist. NOTAMs will be
also be checked for the relevant local area before the flight. This will carried out on the day
of the flight.
2.3.2 Take-Off
Ensuring the entire crew are ready and appropriate safety and security measures are all in
place the PIC will take off as per the UAS checklist.
2.3.3 In Flight
The PIC will operate the aircraft as per the UAS checklist
2.3.4 Landing
Ensuring the landing area is safe and secure. Then landing procedure as per checklist.
2.3.5 Shutdown
Then shutdown procedure as per checklist.
2.3.6 Article 166/167
All flying activities will adhere to articles 166 and 167 of the ANO. These articles can be
found in APPENDIX F. (Unless a specific exemption has been granted by the relevant
authority).