EasyManua.ls Logo

DMN BL200 - After an Explosion

Default Icon
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DMN-WESTINGHOUSE Explosion-Proof Rotary Valves
Code: RV-Ex.pro-E.B.01.D 05-2016
21
5.2. After an explosion
After an explosion the valve must be removed from the installation and completely
cleaned and dismantled.
Replace damaged parts and re-assemble the valve.
Check product temperature and set the clearance according to the attached Final
inspection report.
5.3. Maintenance every 3 months or after 2,500 operating hours
- Check if valve turns smoothly.
- Checking rotor clearances. (see 5.1)
- Check rotary valve for erosion and corrosion damage.
- Check bearings
- Check gland packing
- Check chain.
5.4. Maintenance of the drive
Read the operation instructions supplied by the Motor / Gear unit
manufacturer.

Table of Contents

Related product manuals