EasyManua.ls Logo

DMN BL200 - Standard Execution See

Default Icon
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DMN-WESTINGHOUSE AL-BL Rotary Valves
Code: AL-E.B.01.B 11-2012
43
3.5.3.2 Rotor shaft sealing
Standard executions are :
- shaft sealing with gland packing;
For adjustment and replacement follow the instructions for shaft
sealing . (3.1.3.2 Page 17.)
3.5.4 Dismantling, assembly and adjustment instructions for the valve
DMN-WESTINGHOUSE valves have been manufactured with great care. To reduce
air leakage’s, internal running clearances are kept extremely small during manufacture
and assembly of the valve.
- do not use heavy or rough tools;
- avoid damages like scratches and burrs;
- clean all parts thoroughly.
In case of repair work to the valve, please follow safety instructions
of chapter 1.
- Turn off the electrical supply, lock the switch and/or remove the fuses;
- If necessary, disengage the chain to ensure that the rotor does not turn.
Standard execution
For further instructions use operation instructions
Chapter 3.1.4.1 3.1.4.2 3.1.4.3

Table of Contents

Related product manuals