EasyManua.ls Logo

DMN BL300 - After an explosion; Maintenance every 3 months or 2,500 operating hours; Maintenance of motor; gearbox

Default Icon
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DMN-WESTINGHOUSE Explosion-Proof Rotary Valves
Code: RV-Ex.pro-E.B.01.D 05-2016
19
Direct drive.
4. Dismantling, re-assembling and adjustment instructions
Also read the attached standard operation instructions for the
Rotary valve
Dismantling, assembly and adjustment instructions for the valve are in the attached
standard operation instructions.
In case of repair work to the valve, please follow safety
instructions of chapter 1.
- Turn off the electrical supply, lock the isolator and/or remove the
fuses;
- If necessary, disengage the chain to ensure that the rotor does not
turn.
4.1. Clearance settings
DMN-WESTINGHOUSE valves have been manufactured with great care. To reduce
air
leakage, internal running clearances are kept extremely small during manufacture and
assembly of the valve.
- Set clearance according to the attached Final inspection report or nameplate.
After assembly test run the valve.

Table of Contents

Related product manuals