18
※ Watering for initial operation
1. Open panel and connect the watering hose [1/2”stainless flexible
hose] to solenoid valve
2. Open the ball valve [Available to throttle watering volume by this
valve]
3. Power On at control box
4. Check the watering out of rinse nozzle after opening panel
[It takes 20 minutes to fill up the tank]
5. Check the start lamp (green color) at control box
If green lamp on, the tank is full and the M/C ready to start
6. Turn on the start switch at control box.