EasyManua.ls Logo

DR PRO - Setting Up and Initial Operation

DR PRO
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
contact us at w w w .DRpow er.com 13
2. Secure the rear of the Actuator Bracket to the Frame and Dump Arm with a
5/16-18 X 3" Flange Bolt and Locknut using a 1/2" Wrench and 1/2" Socket
with Ratchet and Extension (Figure 19).
3. Secure the front of the Actuator Bracket with a 5/16-18 X 2-1/2" Flange Bolt
using a 1/2" Wrench and 1/2" Socket with Ratchet and Extension.
4. Secure the front/right (Figure 19) and both left side locations (Figure 20) of
the Bed Frame to the Bed Supports with three 5/16-18 X 2-1/2" Flange Bolts
and Locknuts using a 1/2" Wrench and 1/2" Socket with Ratchet and
Extension.
5. Remove the Plastic Protectors (if present) from the end of the actuator
(Figure 21).
6. Secure the end of the Actuator to the Actuator Bracket with a 1/2-13 X 1-1/2"
Flange Bolt and Locknut using two 3/4" Wrenches.
BOTH MODELS
1. Install the Tail Gate onto the front of the Bed Assembly (Figure 22).
Note: Ensure that the Guide Pins are fully into the Bed and that the Tabs at both
sides are locked into the Side Walls.
Flatbed Installation (Figure 23)
1. Installing the Dump Handle on the Flatbed is the same as the Premier
Model. Refer to Steps 1 through 4 of “Premier Bed - Assembly and
Installation”. See “PRO MODEL WITH HAND DUMP” to secure the
Flatbed to the Dump Arms.
2. Installing the Actuator Bracket and attaching the Actuator to the Flatbed is
the same procedures as the “Pro-XL Model Actuator Dump”. Refer to Steps
1 through 6 of “Pro-XL Model Actuator Dump”.
Flatbed
Figure 23
Tailgate
Figure 22
Guide Pins
Tab
Side
Wall
1/2-13 X 1-1/2" Flange Bolt
and Locknut
Figure 21
A
ctuato
r
Dump
A
rm
Figure 20
5/16-18 X 2-1/2" Flange
Bolts and Locknuts
Figure 19
5/16-18 X 3"
Flange Bolt
and Locknut
5/16-18 X 2-1/2"
Flange Bolt and
Locknut

Other manuals for DR PRO

Related product manuals