EasyManua.ls Logo

DR PRO - Basic Operation: Starting, Stopping, and Controls

DR PRO
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22 DR
®
LEAF and LAWN VACUUM
Figure 50
Inner Link
Adjustment Hole
Default, Recommended Position
Outer Link Assembly
Installing the back Tube Frame Handle
1. Locate the Tube Frame Handle from the Large Parts Box (Figure 4).
Before installing the Tube Frame Handle, we must first set the back width.
2. Set the back width of the canvas by pulling up on the links (Figure 49), until both links are parallel. With both links parallel,
slide the ring link over to prevent the two parts from coming apart (Figure 50).
Note: The canvas is intended to be tight but if the scissor links start to bow out, an adjustment can be made. Start by adjusting the
Inner Link Assembly (Figure 40
) and adjust the canvas as needed to realign the seams in the corners
. If after adjusting the
inner link assembly, the outer link is still bowing, adjust the outer link as shown in (Figure 50).
3. Next cover the Outer Link Assembly by wrapping the rear door flap overtop and velcroing it against the back wall (Figure 51).
4. Attach the Tube Frame Handle by positioning the slots into the two exposed threads on each corner. Once in place, secure
the handle with four Thumb Screw Knobs (Figure 52).
5. Install the Batten by slipping it into the rear door flap and velcroing the end shut (Figure 53).
Figure 49
Pull up on the links
Outer Link Assembly
Ring Link
Velcro
Figure 51
Figure 53
Velcro End
Rear Pocket
Batten
Tube Frame Handle
Thumb
Screws
Figure 52
Thumb
Screws

Other manuals for DR PRO

Related product manuals