Time setting
Setting the date and time for
the time stamp of the process
recording which is shown,
inter alia, in the “final screen”
in the user level.
Factory setting
When reverting back to the
factory settings, the indivi-
dual parameter settings are
deleted and the device is reset
to the delivery state.
9. Maintenance
Maintenance unit
Maintenance frequency
Clean the glass panes in the bottom and the lid of the
polymerization chamber with isopropyl alcohol
daily*
Before commissioning check whether all connections of the
device are positioned correctly:
• gas connection
• mains connection
daily*
Cleaning of the device with a mild detergent weekly*
Maintenance unit
Maintenance frequency
Check whether the LED panels must be or changed
weekly* with program
LED-Test*
Check whether the LED panels must be calibrated
monthly*
Check whether the gas valve works reasonably
weekly*
Check the lid closing function
weekly*
Check whether all seals are still functional and/or fit correctly
monthly*
Maintenance work to be performed by the user
Maintenance work to be performed by the service commissioner
8.5. Placing the components
With the nitrogen version, the supplied
post-curing insert is placed in the expo-
sure chamber and the components are
positioned on the glass plate of the
post-curing insert.
* Recommendation, actual need depends on use intensity and other requirements.