DRISTEEM HIGH-PRESSURE SYSTEM INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
Softener and RO checklist
Dechlorinator/softener system (RO by DriSteem only)
Water treatment system must be purged and free of leaks
Verify power supply to all equipment
Verify inlet water pressure is 60-90 psi
Set the menu item “Regenerate Refill” to “OFF”
Verify backwash sequence is calibrated
Verify drain line is run to floor drain
Slowly open the inlet valve to permit flow of water to tank
Completely open inlet valve when tank is filling
Show the backwash procedure – Proceed with a
backwash as noted the Dechlorinator IOM manual
Water softener and brine tank operation and maintenance
Show how to input/adjust setup settings
Inspect venturi and brine tank for any blockage
Verify brine tank water over flow line is ran to floor drain
Verify water softener drain line is ran to floor drain
Verify and maintain proper salt and water levels in brine
tank
Slowly open the inlet to permit first tank to fill with water
Verify backwash sequence is calibrated
Adjust backwash sequence in relation to the water
hardness
Ensure flow meter cable is connected correctly to the
controller
Proceed with a first and complete backwash as noted in
IOM manual (1 for each tank)
Slowly open the inlet to permit second tank to fill with
water
Verify backwash sequence is calibrated
Adjust backwash sequence in relation to the water
hardness
Ensure flow meter cable is connected correctly to the
controller
Proceed with a second and complete backwash
RO pump station (RO by DriSteem only)
Permeate liquid filled flowmeter gauge _____ GPM
Concentrate liquid filled flowmeter gauge _____ GPM
Recirc liquid filled flowmeter gauge _____ GPM
Filter-in pressure gauge _____ PSI
Filter-out pressure gauge _____ PSI
Concentrate pressure gauge _____ PSI
System pressure gauge _____ PSI
Verify the distance and diameter of piping between RO
station permeate output and the pressurized tank kit
permeate input should match Table 40-1.
Verify air side of bladder tank has full charge of air, if
applicable.
Inspect connections to RO pump,verify water lines are
connected and free of cracks and leaks
Ensure tap water inlet pressure is above 5 psi during RO
operation
Ensure water is flowing from both the pure water
(permeate) and rejected water (concentrate) outlets
Proceed with purging the presence of air from the
membranes
Fill RO water storage tank
Close concentrate valve to correct RO pressure (~125psi)
When the RO tank is filled, stop RO pump and proceed
with completely draining the first fill of tank
Verify proper operation of the ultra-violet lamps (if
applicable)
Start RO pump for new fill cycle of RO tank
Verify and maintain pressure between 30-50 psi in purified
water holding tank
Check the stop-and-go set point for purified water holding
tank
Check the low pressure set point for an alarm
Job site representation ____________________________________
Job name _______________________________________________
Program code ___________________________________________
DriSteem rep ____________________________________________
Visit date _______________________________________________
Model # ________________________________________________
Serial # _________________________________________________
Tag # ___________________________________________________