Do you have a question about the Duracell D-HUB and is the answer not in the manual?
Brand | Duracell |
---|---|
Model | D-HUB |
Category | Battery Pack |
Language | English |
Details critical safety warnings regarding hazardous voltages and the handling of AGM lead acid batteries.
Provides information on California Proposition 65 regarding potential chemical exposure from the product.
Outlines the purpose of the manual and references supporting documents for installation and commissioning.
Provides definitions for key terms and acronyms used throughout the manual.
Guides users on inspecting supplied components for damage or missing parts.
Lists additional tools and hardware required for the installation process.
Explains the overall purpose and operation of the DURACELL HUB in solar plus storage systems.
Details power flow and system operation for grid-connected solar and storage configurations.
Describes the system's behavior and power flow during a grid outage.
Explains the Frequency Shift Power Control (FSPC) method for PV curtailment during backup.
Provides guidance on sizing circuits and systems for different electrical panel capacities.
Addresses configurations where PV systems exceed the HUB's accommodation capacity.
Identifies and describes the main internal components of the DURACELL HUB.
Details the functions and features of the Energy Management Controller (EMC).
Specifies required clearances between the DURACELL HUB and the battery system.
Outlines the conduit plan for power and communication circuits for the system.
Presents a single line diagram for AC coupled PV systems with backup power.
Instructions for connecting the EMC CAT 5 patch cable to the RJ-45 port.
Instructions for connecting the AK1 DURACELL HUB control cable.
Details on making AC power connections to L1, L2, and Neutral.
Explains the importance of phase voltage orientation for system control.
Guides routing AC Grid L1, L2, Neutral, and Ground to the main electrical panel.
Guides routing AC Load L1, L2, Neutral, and Ground to the backup panel.
Instructions for connecting AC_Grid_PCS L1, L2, Neutral, and Ground to the ESS.
Instructions for connecting AC_Load_PCS L1, L2, and Neutral to the ESS.
Details on connecting current transformers (CTs) for system measurements.
Specifies CT connections for the main electrical panel feeders.
Specifies CT connection for the solar PV inverter.
Specifies CT connections for the PCS.
Instructions for connecting the 12V backup battery to the system.
Guidance on setting the EMC selector switch to the correct position.
A checklist of inspections before powering up the system.
Step-by-step instructions for safely starting up the DURACELL HUB and ESS.
A checklist of inspections after the system has been powered up.
Final checklist steps after AHJ approval to operate the energy storage system.
Information on maintaining the DURACELL HUB, including cleaning and inspection.
Provides guidance for diagnosing and resolving common issues with the DURACELL HUB.
Lists detailed electrical ratings and specifications for the DURACELL HUB.
Provides recommended wire types, sizes, and torque values for connections.
Diagram illustrating the internal wiring of the DURACELL HUB and component connections.
Details the function and operation of the Kx bypass/transfer relay.
Explains the role and operation of the K3 PCS transfer relay.
Describes the K1 PCS islanding relay and its function in grid disturbances.
Summarizes PCS operating states and corresponding relay states.
Recommends hard-wired Ethernet for connecting the EMC gateway to the internet router.