Engineering coordination
Attention should be paid to the following items before construction:
Power line specification.
• The power line specification shall meet the requirements of maximum discharge
current for each product.
• Mounting space and bearing capacity.
• Make sure that the battery has enough room to install, and that the brackets have
enough load capacity.
Wiring.
• Make sure the power line and ground wire are reasonable. Not easy to short-circuit,
water and corrosion.
Installation Preparation
1. Prepare equipment and tools for installation.
2. Check the DL5.0C Pro unit and confirm that the ON/OFF switch is in the "OFF" state to
ensure the device is shut off.