EasyManua.ls Logo

Dyness DL5.0C Pro - Page 19

Default Icon
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DL5.0C Pro User Manual
©Dyness reserves the copyright of this document
17
Engineering coordination
Attention should be paid to the following items before construction:
Power line specification.
• The power line specification shall meet the requirements of maximum discharge
current for each product.
• Mounting space and bearing capacity.
• Make sure that the battery has enough room to install, and that the brackets have
enough load capacity.
Wiring.
• Make sure the power line and ground wire are reasonable. Not easy to short-circuit,
water and corrosion.
Installation Preparation
1. Prepare equipment and tools for installation.
2. Check the DL5.0C Pro unit and confirm that the ON/OFF switch is in the "OFF" state to
ensure the device is shut off.
Positioning
cardboard
/
1
Letter to customer
/
1
Warranty card
/
1
Packing list
/
1