EasyManua.ls Logo

Eastsign MOT-M - Machine Installation Guide; Installation Notices and Checks

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eastsign
ROTARY HEAT PRESS MOT
-M USER MANUAL
14
Step 10. Installation of Supporting shaft (34) Put the supporting shaft into the bearings on two stands
Step 11. Installation of the worktable Fasten every screw which connect the shaft and stand, tighten the
bearing holder as well as each bearing rings.
5.3 Notice
1. Check whether all screws in machine are loose or not, tighten them if loose.
2. As the equipment is heating machinery, the machine should be used at environment of ventilating, dry
and noncorrosive gas. Make sure no inflammable and explosive materials around the machine.
3. The crust of machine must be grounded separately.
4. Choose power wire which has section above 6 square millimeters.
5. Keep the machine in level while installation. Use level meter to check if the machine is level.

Related product manuals