4.2 Recommended positions
Place the Eaton 5E on a flat, stable surface in its final location. Always keep 6" or 150 mm of free space near UPS openings
for ventilation.
Installation in tower position
4.3 UPS connection
Power supply cord / socket
Connect the UPS to the AC-power source through a wall outlet equipped with an earth connector, using the attached
cord.