EasyManua.ls Logo

Eaton 600 A 15 kV class - Completing T-Body Termination

Eaton 600 A 15 kV class
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Completing T-body termination
Step 12.
Install STUD into apparatus bushing
ote:N Use only the symmetrical aluminum (STUD-A) or
copper (STUD-C) stud in separable splice and BOL-T
applications. Do no use the non-symmetrical
extended length STUD-T.
Ensure unit is de-energized.
Thread the stud into the apparatus bushing unit hand
tight. Refer to Figure 25.
Engage the flats on the stud with a 1/2" wrench and
thread the stud into the bushing an additional 1/4
revolution past hand tight.
Remove any shavings that may have been raised during
the threading procedure.
Install BOL-T connector onto apparatus bushing
Step 13.
Install T-body onto apparatus bushing
Clean and lubricate mating interfaces of apparatus
bushing and T-body with lubricant supplied.
Push T-body onto apparatus bushing ensuring that the
stud on the bushing passes through the hole of the
compression connector. See Figure 26.
1
/
2
" CROWSFOOT
WRENCH
Figure 25. Line illustration of bushing stud installation.
Symmetrical STUD-A or STUD-C
Apparatus Bushing
Figure 26. Line illustration of BOL-T connector installation
onto apparatus bushing.
Clean and Lubricate 600 A Interfaces
T-body
Apparatus
Bushing
Concentric Neutral
Wires
12
600 A 15/25 kV class BOL-T connector assembly installation instructions for MN650005EN February 2015

Other manuals for Eaton 600 A 15 kV class

Related product manuals