Step 9.
Install shear bolt connector
ote: N Refer to the separate installation instructions
supplied with the shear bolt connector.
Install the centering ring.
Refer to Figure 11 and Table 1 to determine what size
conductors require a centering ring and the correct
color to use.
Wire brush conductor (aluminum only).
Immediately insert the conductor completely into the
barrel of the lug and rotate the connector to distribute the
inhibitor.
Align the flats of the connector and apparatus bushing for
minimum conductor strain.
ote: N Connector must be fully seated on cable conductor.
With an Allen hex key as specified in Table 2, screw in
bolt No. 1 until it breaks off smoothly. Proceed with bolt
No. 2 in a similar way. If the lug has more than two (2)
bolts, continue with bolt No. 3 and bolt No. 4 (not shown
in
Figure 11
). See
Figure 11
for tightening sequences.
Once all the bolts have broken off, smooth any rough
edges with a file and install the covering caps. Carefully
clean off any filings.
Wipe excess inhibitor from connector and adapter
surfaces.
Step 10.
Check di men sions
Check the length from the end of the com pres sion con-
nec tor to the top of the cable adapter.
The length should be no longer than “E” dimension.
(Re fer to Figure 12 and Table 2.)
Install BOL-T T-body with mating parts
Step 11.
Install DT625 T-body
Clean and lubricate outside of the cable adapter with
lubricant supplied.
Clean and lubricate the inside of T-body with the lubricant
supplied.
ote: N If test point T-body is used, ensure the test point
is opposite the front plate side of the T-body.
Without moving the cable adapter, slide the T-body onto
the cable adapter until the compression connector eye is
centered in 600 A interfaces. (Refer to Figure 13.)
ote: N The end of the cable adapter must line up with
the top edge of the tape marker after T-body
assembly. Refer to Figure 10.
Remove the tape marker from the cable.
Go to "Step 12." on page 12, to complete T-body ter-
mination.
Concentric
neutral wires
Shear bolt connector
“E”
See Table 2
Tape
marker
Cable adapter
Figure 12. Line illustration for dimensional check..
T-Body
Cable Adapter
Tape Marker
Concentric Neutral Wires
Lubricate
600 A Interfaces
Apparatus
Bushing
Test Point on Accessible
Side
Figure 13. Line illustration of BOL-T T-body installation.
Start with Bolt 1
Figure 11. Mechanical lug tightening sequence.
Bolt 2
Bolt 1
Bolt 3
Centering ring
6
600 A 15 kV and 25 kV class BT-TAP connector system installation instructions MN650004EN May 2021
Catalog data MN650004EN
Effective May 2021
Deadbreak apparatus connectors

Other manuals for Eaton 600 A 15 kV class

Related product manuals