52
Remove the UPS:
1. Disconnect all the EBMs from the UPS and ensure that the UPS has been
completely shut down.
2. Remove all the wiring between the MBP and the UPS, then remove the UPS for
maintenance/replacement.
Caution:
When removing the ‘UPS to MBP’ connection cables, only remove the top cover of the terminal
box. Leave the AC input/output connection terminal box as is to prevent electric shock.
Note:
After the removal of the UPS, it is recommended to replace the plastic panel to the MBP
to prevent accidental operation of the switch, causing potential electric shock.