20
• Tower mount:
1. Place the EBM modules on the right side of the UPS and align with the front
panel of the UPS module.
2. Fasten the pedestal feet: one to the side of the UPS, and the other to the side
of the EBM (see diagram below).
Pay attention to this installation:
1. EBM modules must be installed to the right of the UPS module.
2. Reserve clearance for at least 2 x EBM modules to the right of the UPS module.
EBM modules are heavy and requires at least 2 people to handle.