4. Power cables connection
4.1   Access to terminal blocks
1.  Remove the terminal blocks cover (one screw)
2.  Punch the knockouts and insert the cables/conduits inside
High leakage current: z
Earth connection essential before connecting supply.
4.2   Input/Output connection
This type of connection must be carried out by qualified electrical personnel
Before carrying out any connection, check that the upstream protection device (Normal AC 
source) is open "O" (Off).
Always connect the ground wire first
If you ordered a HotSwap MBP, refer to the specific user manual to check the terminal blocks 
connection of the UPS with the MBP. 
OUTPUT NORMAL AC SOURCE
t t L1L1
N(L2) N(L2)
1 -  Insert the Normal AC cable through the cable 
gland.
2 -  Connect the three cables to the Normal AC 
source terminal blocks.
3 - Insert the Output cable through the cable gland.
4 - Connect the three cables to the Output terminal 
blocks.
5 -  Put back and secure the terminal blocks cover 
with the screw.
6 - Tighten the cable glands.